top of page

Successful Lithium Drill Campaign Completed at Dome North

Pegmatites intersected in all six targeted zones, with assays

expected within 4 – 6 weeks



HIGHLIGHTS


  • The expanded 5,934m Reverse Circulation (RC) drill programme targeted six zones within the Dome North area at the Pioneer Dome Project, with pegmatites intersected within each zone.

  • Two new prospects (DN6 and DN21) were drilled ~2km south-west of the Heller Deposit with thick pegmatites intersected.

  • Four holes were drilled into the upper zone (0-40m) of the Cade Deposit to test the lithium grade and mineral assemblage and to ascertain the degree of weathering and near surface lithium depletion. An air-core hole drilled in June 2020 intersected 21m @ 1.79% Li2O from 4 metres (Hole PDAC386)1, indicating minimal lithium depletion in that area.


bottom of page