Pegmatites intersected in all six targeted zones, with assays
expected within 4 – 6 weeks
HIGHLIGHTS
The expanded 5,934m Reverse Circulation (RC) drill programme targeted six zones within the Dome North area at the Pioneer Dome Project, with pegmatites intersected within each zone.
Two new prospects (DN6 and DN21) were drilled ~2km south-west of the Heller Deposit with thick pegmatites intersected.
Four holes were drilled into the upper zone (0-40m) of the Cade Deposit to test the lithium grade and mineral assemblage and to ascertain the degree of weathering and near surface lithium depletion. An air-core hole drilled in June 2020 intersected 21m @ 1.79% Li2O from 4 metres (Hole PDAC386)1, indicating minimal lithium depletion in that area.